1-808-900-3313

HDOT – PHASE 2

CONSTRUCT THE WAKEA STREET OVERPASS, H-1 WESTBOUND OFF-RAMP TO WAKEA STREET.

WAKEA STREET WESTBOUND ON-RAMP TO FARRINGTON HIGHWAY  

NTP issued 10/14/2015 Project completed 1/2020.

Project Cost $64.5M Client: HDOT

Kapolei Interchange Phase 2 is a federally funded project that constructed new on and off ramps, roadway modifications, and elevated bridge/overpass, and connections to Farrington Highway. The scope included concrete paving, pre-cast concrete panels, pre-cast girders, post-tensioned concrete, asphalt paving, and the installation of highway lighting and traffic signals. The project will help to relieve area congestion by providing additional ramps and a new overpass from the Waikea Street Extension to westbound lanes on H-1 Freeway.